Mr. B V B G Shankar is having 22 Years of experience in Projects Execution in CFBC, AFBC and Recovery Boilers: expertise in Boiler pressure parts, Non-pressure parts; fabrication and erection and Team Management; erection and commissioning; Project execution & monitoring the progress of EPC of power projects and boilers. Involving in overhauling activities; monitoring running parameters of Turbine; Dismantling of turbines; Inspection of components; Replacement of damaged components; correction of centering and alignment; setting of clearances with reference to design/erection protocol values; Replacement of rotor, nozzle box and Guide blade carrier. Preparation of cost estimates and bill of quantities for procurement of Plant &Machinery and Piping systems for Thermal & WHRB Power plants. He has an Excellent Communication & Interpersonal Skills; Strong Interpersonal and Behavioral Skills; Self-Driven; Result-oriented; Positive Outlook Attitudes. Headed the Power Plant with 12 MW capacity, with M/s. Hare Krishna Metallics Pvt. Ltd. - at Hirebagnal (Vill.), Koppal Dist., Karnataka. The Power plant has been erected, commissioned and operation & Maintenance was done successfully.
Mr. S Anil Kumar is having 20 Years of experience in Projects Execution in CFBC, AFBC and Recovery Boilers. Expertise in Boiler pressure parts, Non-pressure parts fabrication and erection and Team Management. Project execution, erection and commissioning, execute & monitoring the progress EPC of power projects and boilers. Erection & Commissioning of STG, Boiler & BOP, erection of IBR pressure piping, L.P. piping performing quality checks (NDT), erection of rotating equipments. Familiarity with IBR, ASME & PTC codes of pressure piping, boilers & pressure vessels. Handling site activities and report day-to-day progress. Estimating materials, planning & arranging for resources like equipments, manpower etc for the thermal power project and Process Plants. Project execution, erection and commissioning of 2x185 TPH CFBC Boiler at Action Ispat & Power Ltd and 2x165 TPH CFBC Boiler at Hindalco Power at Jharsuguda. He has handled the plants of capacities 3 X 130 MW Power plant Operation & Maintenance consisting of 1 x 390 and 1 x340 TPH CFBC Thyssen Krupp make, 4 X 210 TPH CFBC IJT make and 12 x 58 TPH WHRSG Thermax make with auxiliaries.
Mr. T V Umakanth is a Graduate Engineer in Electrical and Electronics and having 30 years of rich experience in project management and operations & maintenance of thermal power plants. Extensive experience in application engineering and erection, testing, pre-commissioning & commissioning of all electrical and control & instrumentation systems of boiler & turbine generator (BTG) and electrical balance of plant (EBOP) of power plants and CFBC & AFBC boilers and auxiliaries like ESPs and coal & ash handling systems. Sound technical knowledge of all electrical equipment of BTG, EBOP, ESP and auxiliary units, PLC, DCS & SCADA control, protective relays, governors & turbine controls and vibration monitoring systems and is well versed with modern engineering & construction methods, project management techniques and all applicable codes and standards.
Mr. N V Jayaram is a Post Graduate in Accounts and having an experience of 30 years in the field of accounts and he is associated with us from last 10years. He will handle all the financial related in & outs for our organization.
© Copyright . Amaravathi Power Associates.
Powered By Hamsikha Technologies.